Skip to content
SDBRSan Diego Balcony RepairCall

Condominium and HOA repair support

SB 326 Repairs San Diego

HOA boards and condominium associations need repair scopes that are clear enough for board review, owner communication and construction coordination. All World Construction handles balcony, deck, walkway, stair, railing, waterproofing and framing repair after professional inspection findings.

How this starts

  1. 1. Upload the report or photos.
  2. 2. Confirm project fit and access constraints.
  3. 3. Move to site evaluation when responsible pricing needs field review.

Board-ready repair coordination

  • Translate inspection findings into a practical repair path
  • Support occupied-property phasing and access planning
  • Coordinate waterproofing, framing, stucco and railing trades
  • Document repair work for manager, board and closeout records

Important SB 326 context

SB 326 applies to qualifying condominium projects and HOA-maintained exterior elevated elements in buildings with three or more attached multifamily units. The statutory inspection is performed by a licensed structural or civil engineer or architect. The first deadline was January 1, 2025, with reinspection generally every nine years.

Site Evaluation and Written Bid Package

Responsible Pricing Starts With the Actual Assembly

Detailed balcony, deck, waterproofing, framing, HOA, multifamily, and multi-trade repair projects may require an onsite evaluation before responsible pricing is possible. The Site Evaluation and Written Bid Package is $250. The $250 is credited back if the construction project is approved within 30 days.

Hidden damage, destructive openings, engineering, laboratory testing, permits, specialty access and hazardous-material work are separate unless specifically included.

Review Site Evaluation Path

Start Here

Start With the Report, Photos and Property Address

Upload the inspection report, site photos, address, property type and a short description. All World Construction will review the fit and recommend the next responsible step without guaranteeing a price from incomplete information.

Response timing depends on project detail, file quality, current workload and whether an onsite review is needed.

Reports or files included
CallText PhotosUpload Report